by Adaptive Architects | Feb 20, 2018
Date 01.2016-07.2017 Client City of Tempe Status Complete Location Tempe, Arizona Size 11,697 SF pool; 8,471 SF pool deck; 1.1 acre site Project description McClintock Pool was constructed by the City of Tempe on Tempe Union High School District property in 1964, and...
by Adaptive Architects | Jan 23, 2017
Date 2012-2013 Client City of Mesa Status Complete Location Mesa, Arizona Size 33,000 SF Project description Adaptive Architects helped the City of Mesa select the final project site for the Fiesta District Police Station from several potential project locations that...
by Kelly | Jan 19, 2017
Date 2014-2015 Client Phoenix-Mesa Gateway Airport Status Complete Location Mesa, Arizona Size 14,115 SF Project description Adaptive Architects designed the Phoenix-Mesa Gateway Airport Authority Administration Building Remodel, consisting of a complete interior...
by Kelly | Jan 19, 2017
Date 2000-2002 Client City of Mesa Status Complete Location Mesa, Arizona Size 16,065 SF Project description The City of Mesa Red Mountain Police Substation demonstrates a design concept that the city and police chief at the time were strongly embracing, with a design...
by Kelly | Jan 19, 2017
Date 2013 – 2014 Client City of Mesa Status Complete Location Mesa, Arizona Size 3,128 SF (building) 5462 (canopies) 20,337 SF (pools) Project description The Mesa Aquatic Complex at Mesa High School was a joint effort between Mesa Public Schools & the City of...